论文部分内容阅读
广东省韶关发电厂是广东粤电集团有限公司下属的大型骨干发电企业,始建于1958年,前后经历了7期工程建设,期间共建成11台发电机组。随着老机组的退役和新机组的投运,目前在运两台30万千瓦容量机组(编号为10号、11号),在建两台60万千瓦容量机组。韶关电厂两台30万千瓦机组始建于本世纪初期,机组性能相对落后,随着电力市场竞争愈演愈烈,节能降耗工作显得刻不容缓。2010年韶关电厂主要经济指标完成情况如下:全厂供电煤耗357.7克/千瓦时;直接厂用电率8.59%。
Guangdong Shaoguan Power Plant is a large-scale backbone power generation enterprise affiliated to Guangdong YUDEAN Group Co., Ltd. It was built in 1958 and has undergone seven phases of construction before and after the construction of 11 generating units. With the decommissioning of the old unit and the commissioning of the new unit, two units of 300,000 kilowatts (numbered 10 and 11) are currently being shipped and two units of 600,000 kilowatts are under construction. Shaoguan Power Plant two 300,000 kilowatts generating units were built in the early 20th century, unit performance is relatively backward, with the intensifying competition in the electricity market, energy saving work is imperative. The main economic indexes of Shaoguan Power Plant in 2010 are as follows: The coal consumption of the whole plant is 357.7 g / kWh; the direct electricity rate of the plant is 8.59%.