【摘 要】
:
This paper presents a methodology for risk assessment of plants producing and storing explosives. The major procedural steps for quantified risk assessment (QRA
【机 构】
:
Systems Reliability and Industrial Safety Laboratory (SRISL), Institute of Nuclear Technology-Radiat
论文部分内容阅读
This paper presents a methodology for risk assessment of plants producing and storing explosives. The major procedural steps for quantified risk assessment (QRA) in explosive plants are the following: hazard identification, accident sequence modeling, data acquisition, accident sequence quantification, consequence assessment and integration of results.This methodology is demonstrated and applied in an explosive plant consisting of four separate units, which produce detonating cord, nitroglycol, dynamites and ammonium nitrate fuel oil (ANFO). A GIS platform is used for depicting individual risk from explosions in this plant. Total individual risk is equal to 1.0 × 10-4/y in a distance of 340m from the center of the plant, and 1.0 × 10-6/y in a distance of 390m from the center of the plant.
其他文献
It is a challenge to realise an EKF-based sensorless controller for an Interior Permanent Magnet (IPM) brushless ac motor drive due to the influence of non-line
2014年11月17日,联合国附属空间科学与技术教育亚太区域中心(中国)(以下简称区域中心)落户北京航空航天大学。这是联合国首次在中国设立空间教育机构,该机构将致力于亚太地区空间技
2014年11月27日,中国宇航学会·中国空间法学会2014年学术年会在北京召开。年会的主要日程包括开幕式、大会报告、分组交流和奖励优秀论文,主办单位及相关科研机构和高等院校的
本刊讯:2009年11月10日,中国交通运输协会城市轨道交通专业委员会“2009年城市轨道交通高层论坛”在北京五洲大酒店隆重举行。大会由高毓才主任主持,200多名相关领导和业内人
In the paper, excess methods for improving the reliability of multi-state series-parallel systems are presented: for the hot reserve of single components, the c
收入分配制度改革是事业单位改革和医疗卫生体制改革的重要内容,对于理顺分配关系、规范分配秩序、构建和谐的收入分配格局具有重要意义.文章介绍了在新的收入分配制度改革政
胎位不正是妊娠30周,胎儿在子宫内先露部分不是头部而是其他部位(臀部、横位、复合先露位等胎头异常)者.临床以臀位最为常见,且容易发生脐带脱垂和后出胎头分娩困难,围产儿死
Construction conception of an object requires multi-criterion analysis. In such a case, reliability analysis gives rough information on availability and fulfill
PCC是3GPP标准定义的IMS承载网络资源与计费策略控制架构,旨在为用户提供差异化的服务,提供用户业务流承载资源保障以及流计费策略。从策略控制的角度介绍了PCC机制的基本架
2012年度全球共进行78次运载火箭发射活动,共发射各类航天器135个。其中3次发射失败,3次部分发射失败,共有128个航天器成功入轨,世界航天活动稳步发展。在2012年里,俄罗斯发