在黄土丘陵沟壑区,进行沟壑土坝设计,其洪水演算,多采用积浅图解法或概化过程线法,因手续较烦,往往在设计过程中,耗费很多的劳动力和时间,影响工作效率。陕北沟壑土坝施工,曾由原西北黄河工程局作过一些标准设计。对于放流滞洪的演算,是采取用实际洪水过程线所推求之概化过程线,来推算没有观测资料时的实际洪水过程线,以确定最大泄洪量滞洪库容,以简化计算手续。但因划过程线和其他曲线图的步骤不能省略,仍较费事。推求概化过程线
In loess hilly and gully areas, dams and earth dam design, the flood calculation, the use of plot method or the generalized process of more lines, due to the formalities more annoying, often in the design process, consuming a lot of labor and time, affecting work efficiency . Northern Shaanxi dug earth dam construction, once by the Northwest Yellow River Engineering Bureau made some standard design. The calculation of releasing stagnant flood is based on the generalized process line deduced from the actual flood process line to calculate the actual flood process line without observed data so as to determine the maximum flood discharge flood storage capacity to simplify the calculation procedures. However, the process of drawing process lines and other graphs can not be omitted, it is still troublesome. Seeking a generalized process line