红花水利枢纽是广西柳江干流规划中最下游的一个梯级,现有一线船闸通过能力仅为每年663万t,已达到饱和状态,成为柳江航运的瓶颈。拟建二线船闸布置于现有红花水利枢纽一线船闸左侧,按2 000 t级(兼顾通航3 000 t级船舶,Ⅱ级船闸)规模建设,设计单向通过能力为每年2 860万t。二线船闸建成投入使用后可有效解决一线船闸通过能力不足问题,改善柳州水路交通条件。施工图设计阶段的勘探任务主要分为陆地孔、水上孔两部分。陆地孔的工作主要包括:根据初设审查意见安排的高
The Honghua Hydropower Project is the most downstream step in the Liujiang River mainstream planning in Guangxi. The existing first-line ship lock capacity is only 6.63 million tons per year, which has reached the saturation state and becomes the bottleneck of Liujiang Shipping. The proposed second-line lock is arranged on the left side of the existing first-line lock of the Honghua Hydraulic Complex and is constructed on a scale of 2 000 t (taking into account the navigation of 3 000 t class and Ⅱ lock). The designed one-way passing capacity is 28.6 million t per year. After the second-line lock is completed and put into use, it can effectively solve the problem of insufficient capacity of first-line lock and improve the traffic conditions of Liuzhou waterway. The exploration tasks in the construction design phase are mainly divided into two parts: land hole and water hole. The work of land holes mainly includes: Arranged according to the initial review comments