金沙江流域水能资源丰富,可开发装机容量约9000万千瓦,约为三峡电站的5倍。溪洛渡—浙西±800千伏特高压直流输电工程是金沙江下游溪洛渡左岸水电外送配套输电工程,是公司建设的第三条特高压直流工程,也是“西电东送”的重要通道。溪洛渡—浙西±800千伏特高压直流输电工程(以下简称溪浙工程)起于四川宜宾双龙换流站,落于浙江金华换流站,新建±800千伏直流输电线路约1680公里,途经四川、贵州、江西、湖南和浙江5省。工程额定输送容量800万千瓦,动态投资
Jinsha River basin rich in water resources, can be installed capacity of about 90 million kilowatts, about three times the Three Gorges Power Station. Xiluodu - Zhexi ± 800 kV UHVDC transmission project is the Xiluodu left bank of the Jinsha River on the left bank of the hydropower out of supporting transmission projects, the company is building the third UHV DC project, but also “west to east” important passage. Xiluodu - Zhexi ± 800 kV UHVDC Transmission Project (hereinafter referred to as Xixi Project) started at Sichuan Yibin Ssangyong Converter Station and landed at Jinhua Converter Station in Zhejiang Province. The new ± 800 kV DC transmission line was built approximately 1680 km via Sichuan Guizhou, Jiangxi, Hunan and Zhejiang provinces. Project rated capacity of 8 million kilowatts transmission capacity, dynamic investment