西气东输二线管道干线起点位于新疆伊犁霍尔果斯口岸,终点位于广东省广州市,线路全长4918km。根据总体走向方案需要,线路在新疆伊犁霍城县东北翻越天山山脉,此段山区区域地质条件复杂,管道敷设基本是在大东沟—玉他斯沟—阿克萨伊沟—阔克萨伊沟—柯伊拉克地沟—加木帕斯夏子沟间敷设,这几条沟通过7条隧道连通后就形成西气东输二线进入中国后第一次翻越天山的最终方案。果子沟内泥石流、危岩、滑坡、洪水、雪崩
The starting point of the trunk line for the second West-East Gas Pipeline is located in the port of Huoerguosi, Ili, Xinjiang. The terminal is located in Guangzhou, Guangdong Province, with a total length of 4918km. According to the overall needs of the program, the line over the Tianshan Mountains northeast of the Yocheng Huocheng County in Xinjiang, the geological conditions in this section of the mountain area is complex, the pipeline laying is basically in the Dadonggou - Yatagou - Aksaigou - Ditch - Ko Iraq’s ditch - plus Mumu Pascal Zi ditch between the laying of these channels through the seven tunnels connected to form the second West-East Gas pipeline into China after the first time over the Tianshan final program. Fruit ditch debris flow, dangerous rock, landslides, floods, avalanches