论文部分内容阅读
运用PDCA循环研究了电网企业的成本目标控制,明确了在计划(P)、实施(D)、检查(C)、改进(A)四个阶段的具体工作。成本控制目标在PDCA循环的过程中不断完善并得到改进,对电网企业实行低成本战略具有重要意义。
The PDCA cycle was used to study the cost target control of power grid enterprises and the concrete work in the four stages of planning (P), implementation (D), inspection (C) and improvement (A) The goal of cost control is constantly improving and improving during the cycle of PDCA, which is of great significance to the low-cost strategy implemented by power grid enterprises.