论文部分内容阅读
我矿广大工人在党的十大精神鼓舞下,深入开展批林批孔,进一步大打矿山之仗。1973年9月在学习河北铜矿经验的基础上,发扬了敢想敢干的革命精神,组织了由36人组成的斜天井吊罐掘进队,同时有6条吊罐作业线,会战30天创造了进尺1130米、掌子面平均工效1.05米的好成绩。会战地区矿体赋存情况:矿脉走向长400~800米,平均脉宽0.25~0.4米,矿脉平均倾角70~80度,f=8~12,天井通过的岩层为变质砂岩和闪长岩,属中等稳定岩层。
Inspired by the top ten spirits of the party, the vast majority of mine workers in mine have carried out in-depth appraisal of the holes approved by the masses and further fought the battle of the mines. September 1973 On the basis of learning from the experience of Hebei Copper Mine, it carried forward the revolutionary spirit of daring to dare to do and organized a 36-member inclined tunnel hanging tank-digging team with six hanging tank operation lines for 30 days of battle Created to 1130 meters footage, the average efficiency of 1.05 meters on the dough surface good results. Occurrences of ore bodies in the battlefield: The ore veins are 400 to 800 meters in length and the average pulse width is 0.25 to 0.4 meters. The average inclination angle of the veins is 70-80 degrees, f = 8-12. Passages passing through the pavilion are metamorphic sandstones and diorites, Is a medium stable rock.