(1)工场布置要做到工场布置得合理,加速施工进度,一般群众性农田水利工程应做好以下几点:第一,充分利用地形,合理布置,达到省工省力。淮北平原河网工程,工场布置应着重在如何发挥独轮车,转盘斗车,拖斗车的作用。挖深2米以上,坡度较陡时,可以布置滑车,吊杆等工具;同时应考虑到河网的级别,工具效能,均匀地安排先进工具,防止过稀过密;轨道布置尽可能做成双轨或循环轨道,便于流水作业;渠坡上可开咸坡度较大的人字形斜路,便于车辆上下。山区或丘陵地区的水库,地势变化多,需根据地形特点布置运输工具,缓坡地区布置牛拖列车和滑车道,陡坡地区布置空中运土器和自动滑槽等,便于由高向低处运输的工具。运输路线分
(1) Workshop layout To make the workshop layout reasonably and speed up the construction progress, general masses of farmland water conservancy projects should do the following: First, make full use of terrain and reasonable layout to achieve labor-saving and labor-saving. Huaibei Plain River network engineering, workshop layout should focus on how to play a wheelbarrow, car turntable, trailer truck role. Dug deeper than 2 meters, the steep slope, you can layout trolley, boom and other tools; the same time, should take into account the river network level, tool performance, uniform arrangement of advanced tools to prevent excessive thinning too thin; track layout made as possible Double track or circular track, easy flow of work; drainage slope can be opened on the gradient of the herringbone slope, easy to vehicle up and down. The reservoir in mountainous or hilly area has many terrain changes. The transportation tools should be arranged according to the terrain features. The cattle trains and runways should be arranged in the gentle slope areas. The air carriers and the automatic chutes should be arranged in the steep slope areas to facilitate the transport from high to low. . Transport routes points