HSAEP:a new platform to evaluate hybrid simulation algorithms

来源 :计算机科学前沿 | 被引量 : 0次 | 上传用户:ttgxa
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1 IntroductionrnHybrid simulation method in civil engineering is a test method that combines numerical simulation and physical testing[1].The basic procedure of hybrid simulation is shown in Fig.1.In hybrid simulation,the performance of the algorithm has a great influence on the test results[2].However,there is no stan-dard test platform or standard model to test the performance of the hybrid simulation algorithm.These situations limit the development of hybrid simulation algorithms and may lead to unreliable hybrid simulation results.
其他文献
1 IntroductionrnThe fact that the spectrum resource is underutilised in cer-tain bands has motivated the dynamic spectrum access (DSA)approach,which enables unlicensed secondary users (SUs)equipped with cognitive radio (CR) devices to access the spec-trum
期刊
摘要:随着经济与科学技术不断发展,各行各业信息技术也不断发展,建筑业也不例外,在工程建设项目管理中,造价管理为三大管理之一,尽管我国造价管理体系得到一定的发展和完善,计价模式和工具都得到提高,但仍然存在不足。BIM技术的出现很好解决现阶段造价管理中横向信息流失,纵向交流的障碍,使工程造价更准确与方便。  关键字:建筑信息模型;工程项目;造价管理  中图分类号:TU723文献标识码: A    0、
期刊
Attribute-based encryption with keyword search(ABKS) achieves both fine-grained access control and keyword search.However,in the previous ABKS schemes,the search algorithm requires that each keyword to be identical between the target keyword set and the c
User profiles are widely used in the age of big data.However,generating and releasing user profiles may cause se-rious privacy leakage,since a large number of personal data are collected and analyzed.In this paper,we propose a differ-entially private user
1 IntroductionrnVisual tracking has long been considered as a fundamental mis-sion in computer vision,and it has been widely used for many applications.Siamese trackers[1]utilize Siamese network to do template matching and achieve state-of-the-art perform
期刊
以钢筋混凝土受弯构件正截面的设计计算为研究对象,从材料指标选用、承载能力极限状态设计、正常使用极限状态设计、其他构造要求等方面对水运行业标准和水利行业标准进行对比和分析,并以某临海水闸工程为例进行计算结果对比,为类似的行业交叉领域工程项目设计提供参考.
在电子信息大发展的当今时代,传统监理工作方法体现出一些不足.而把BIM技术应用于监理工作中,在传统的三维模型添加了时间轴的概念,帮助我们了解不同时间下,BIM整个三维模型的变化,暨在同一时段不同组件的施工进度与状态的变化,从而进行优化和控制,实现可视化、精细化、便捷化、信息完备化的进行项目管理工作,提前了解掌握工程的全貌及预计施工的过程.本文根据BIM技术在某房建施工监理工作中的应用,提出合理化建议,增强了传统监理工作模式的管控能力,协助完成项目管理在执行各阶段时间流程的规划管理,提高了工程质量与施工安全
码头堆场作为港口工程的重要组成部分,其实施尤为重要.本文结合北海港铁山港区5#泊位重箱堆场工程施工实践,从不同角度总结重箱堆场施工四个特点,分析了其施工关键工序及控制要点,并对设计优化和运营使用提出建议.
本文以某核电厂排水口为研究基础,通过物理模型试验对消能坎、消力墩、消力池、护底混凝土板等多种消能和防冲刷设施的不同组合、不同布置形式及不同的尺度进行优化分析研究,从而形成核电厂排水口消能设施方案.通过试验可知,在排水口内设置消力墩、提高尾坎高度,使得水流在排水口内尽量充分消能,能够达到分流、扩散、消能的效果,有效防止排水口附近区域的冲刷.试验成果可为类似核电厂或火电厂等排水口防冲刷工程提供参考.
Nowadays,human activity recognition is becom-ing a more and more significant topic,and there is also a wide range of applications for it in real world scenarios.Sensor data is an important data source in engineering and application.At present,some studies