6月17日,由水电部东北勘测设计院设计、水电部第六工程局负责安装,在太平湾水电站首次采用的节间充水平压并利用水柱加重进水口事故闸门动水关闭试验成功。为了使这项新技术尽快的应用到施工中去,使之发挥应有的经济效益,负责该项设计的有关工程技术人员从1978年开始了可行性研究,先后在理论上解决了闸门充水减振、充水开度自控、节间联接错
June 17, by the Ministry of MEP Survey and Design Institute of Northeast Design, Ministry of Water Resources and the Sixth Engineering Bureau is responsible for installation, Taiping Bay hydropower station for the first time the use of in-plane filling pressure and the use of water column to aggravate the water inlet gate closed successfully. In order to make this new technology applied to the construction as soon as possible, to make its due economic benefits, responsible for the design of the engineering and technical personnel from the feasibility study started in 1978, has in theory solved the floodgates Vibration damping, water-filled opening of the control, internode connection wrong