每一施工阶段必须有验收程序。 作为一片田径场来说,其施工主要分为两个阶段,一是沥青基础层的施工,二是塑胶面层的施工。这两个施工阶段是前后相互衔接的工序,因此,它们之间就有一个相互交接的过程,这就是沥青基础层施工结束后的验收;而面层施工结束后的验收,则是施工单位向业主(甲方)交付使用的必要过程。 作为每一阶段的验收,除了施工单位的自评资料外,还必须有监理单位的测评报告(包括有关的材料测试数据)和测绘单位的测评报告(包括平整度、倾斜度和所有跑道
Each construction phase must have an acceptance procedure. As a track and field, the construction is mainly divided into two phases, one is the construction of asphalt base layer, and the other is the construction of plastic surface layer. The two construction stages are the process of connecting each other before and after. Therefore, there is a process of mutual transfer between them, which is the acceptance after the construction of the asphalt base layer is completed. The inspection after the construction of the surface layer is completed by the construction unit Owners (Party A) the necessary process of delivery. As the acceptance of each stage, in addition to self-assessment data of the construction unit, it is also necessary to have the evaluation report (including relevant material test data) of the supervision unit and the evaluation report of the survey unit (including the flatness, inclination and all runways