5号高炉不断优化操作工艺,强化管理,生产水平不断提高,高炉月平均利用系数2002年6月份达3.372t/m~3·d,7月份再创纪录,达到3.498t/m~3·d,最近高炉平均日产稳定在1370吨以上。 5号高炉投资1.38亿元,仅用8个月时间便竣工投产,于2001年10月30日点火送风,创国内同类型高炉建设的新纪录。 5号高炉采用了无料钟炉顶、皮带上料、水冷综合炉底、炉身水冷模块、干法除尘、球式热风炉和液压开口机等多项利于强化冶
The No. 5 blast furnace continued to optimize the operation process, strengthen management and continuously improve the production level. The monthly average utilization coefficient of the blast furnace reached 3.372t / m ~ 3 · d in June 2002, setting a new record of 3.498t / m ~ 3 · d in July , The average blast furnace recently stabilized at more than 1370 tons. 5 blast furnace investment 138000000 yuan, only 8 months time will be completed and put into production, on October 30, 2001 ignition, creating the domestic record of the same type of blast furnace construction. No. 5 blast furnace with a bell-free top, belt material, water-cooled integrated furnace bottom, water cooling module, dry dust, ball-type hot air stove and hydraulic openings, and many other conducive to strengthen the rule of metallurgy