通许县属严重缺水地区,且田间工程配套较差,致使灌区内用水困难,需对项目区进行引黄补源和灌区配套治理。项目区规划开挖治理支沟1条,长4.0km,斗农沟6条,长9.8km,新建分水闸1座,新建桥22座,共需完成土方8.9万m3,混凝土970m3,计划投入资金130万元。项目实施后,可使项目区的灌溉保证率提高30%,改善灌溉面积730hm2,改善除涝面积911hm2,项目区农民人均增收200元。该项目建设技术上可行、经济上合理、经济效益和社会效益显著,建议尽快实施,使其早日发挥效益。
Tongxu County is a severe water-deficient area with poor supporting facilities in the field. As a result, it is difficult to use water in the irrigation area. Therefore, it is necessary to conduct irrigation and water diversion and supporting facilities in the project area. In the project area, 1 branch pipe is planned for excavation and dredging, 4.0 km in length and 6 in Douonou, 9.8 km in length, 1 new sub-sluice and 22 new bridges. It is required to complete 89,000 m3 of earthwork and 970 m3 of concrete with planned investment 1.3 million yuan. After the implementation of the project, the guaranteed rate of irrigation in the project area will be increased by 30%, the irrigation area will be improved to 730hm2 and the area for waterlogging improvement will be improved to 911hm2. The per capita income of farmers in the project area will increase by 200 yuan. The project is technically feasible, economically reasonable and has significant economic and social benefits. It is proposed that the project should be implemented as soon as possible so that it can exert its benefits as soon as possible.