河西支分流控制工程位于鸭绿江支流河下游。该工程坝址长980m,原有一铁丝石宠漫水坝。拟在原坝址处利用原坝基建一过水坝与挡水坝结合的控制工程。坝体利用当地材料砂卵石填筑.过水坝采用过水土坝型式。溢流面极采用浆砌石砌筑,其上浇注一层钢筋混凝土护面。挑流消能,护坦采用钢筋混凝土“井”字网格,内插毛石的结构。此过水上坝较之混凝土溢流堰方案工程量小,施工简单,可节省投资100万元。
Hexi branch flow control project is located in the lower reaches of the Yalu River. The project dam site length 980m, the original one wire stone pet Man dam. It is planned to make use of the control project of integrating the original dam infrastructure with the dam and the retaining dam at the original dam site. Dam using local materials sand and gravel filling. Over the dam used water dam pattern. Overflow surface using masonry masonry, pouring a layer of reinforced concrete face. Tiaoluhunengguan, retaining the use of reinforced concrete “well” grid, insert the structure of stone. This over-water dam compared with the concrete overflow weir project a small amount of construction is simple, can save one million yuan investment.