克里沃罗格矿区露天矿80%以上的剥离岩石堆置在电铲排土场中,排土场高达60~80米,并在继续增加。同排土场毗连的土地实际都是可耕地,所以可为国民经济保存大面积的耕地。
More than 80% of the pealed rock in the open pit mine at Krivoy Roger Mine is piled up in the power shovel dump site, with the dump site reaching 60-80 meters and continuing to increase. The land adjacent to the dumps is actually arable land, so large-scale arable land can be preserved for the national economy.