建国以来,我国的水利建设取得了巨大成就。伹由于过去一段时期,我国的水利建设事业的体制,是属于“重建轻管”的建设型,只讲投入,不讲产出;忽视经营管理,不讲经济效益,以至不少水利工程先天不足,后天失调,老化失修,效能下降,有的水利工程管理部门 Since the founding of the People’s Republic of China, great achievements have been made in water conservancy construction in our country. As a result of the past period, the system of water conservancy construction in our country belongs to the construction type of “rebuilding the light pipe”; it only stresses investment and does not talk about output; neglects business management and does not talk about economic benefits, and as a result, many water conservancy projects are inherently deficient, Acquired disorders, aging disrepair, performance decline, and some water conservancy project management department
其他文献
水电站的施工进度一般主要由三段直线工期组成,即:(1)导流建筑物开工以前的施工准备时间;(2)导流与截流建筑物的施工时间;(3)控制性的主体工程施工时间。影响以上三段直线工
由水利水电规划设计院主持的“深厚砂卵石层金刚石钻进与取样新技术”现场推广交流会,于1988年10月28日至11月3日在成都召开。参加会议的有水利水电系统有关单位的50余位代
泾惠渠渠首张家山大坝于1966~1967年改建,由于混凝土浇筑块大,当时施工的拌和能力小,水平施工缝未按要求严格处理,运行几年后出现渗水现象,且日趋严重,但渗漏总量不大.为了分
奥利韦特碾压混凝土坝位于法国朗格多克的主要沿海河流埃罗河支流上,坝高36m,坝顶长254m,底宽25m,顶宽5m,库容为670万m~3,最大泄洪量 The Olivet RCC dam is located on th
世界海关组织1996年版《协调制度》简介(连载四)王希春第二十章蔬莱、水果、坚果或植物其他部分的制品一、概述本章删除5位数子目1个,税目条文变化的税号有3个,20.04、20.05、20.06,商品范围变化的有2004.90、2005.40、
特定区域自用物资进口税收先征后返问答黄发忠一、何谓“特定区域自用物资进口税收先征后返”?答:从1996年4月1日起,国务院对经济特区和上海浦东新区、苏州工业园区(简称“特定区域”)进
一,程序功能本程序用于计算尾水管单线图,包括尾水管中心线与机组中心线重合和不重合的两种情况,采用BASIC语言,用于PC-1500计算机。二、计算方法简述尾水管的几何形状以弯
地球物理勘探方法,由于它具有方便,经济、效率高等许多独特的优点,因而在水利水电工程地质勘测中得到越来越多的应用。漫湾水电站工程在不同的勘测阶段也进行了相应的物探工
再接再厉夺取反走私斗争的新胜利本刊特约评论员全国打击走私工作会议3月中旬在北京召开。李岚清副总理在会上作了报告,李鹏总理到会作了重要讲话。会议分析了当前反走私斗争形
怀梆戏悠久的历史文化沉淀和浓厚的地方行腔韵味,反映出当地人一种传统的艺术文化审美素养和精神娱乐的方式。在历史发展中,为活跃怀庆府地区人民的精神文化生活,怀梆戏发挥