在供水工程中,由于规划设计考虑不周、设备选型不合适或不合理的运行操作,导致水泵无法安全稳定的运行,严重者可能会发生水锤事故,使水泵出水管道、阀门遭到破坏,甚至使泵房被淹、供水中断,造成重大损失。文章结合太原理工大学供水工程实验室的修建,对供水系统的工程规划进行了研究,并确定了该工程的最佳工程规划方案。
In the water supply project, due to poor planning and design considerations, improper equipment selection or unreasonable operation of the operation, resulting in the pump can not be safe and stable operation, serious cases may occur water hammer accident, the pump outlet pipe, the valve was destroyed , And even flooded the pumping station, interrupted the water supply and caused heavy losses. Combined with the construction of water supply engineering laboratory in Taiyuan University of Technology, the article studied the project planning of water supply system and determined the best project planning scheme of this project.