分析、评价和修正主体工程设计的不足,是今后水土保持方案编制、审查、审批工作十分重要的组成部分。对主体工程选址选线比选方案分析评价后,应分不同情况给以“同意”、“基本同意”、“重新论证和选择”建设方案的结论;对工程占地、土石方挖填及弃渣等不符合水土保持规定和要求的,应要求予以改正;对取土(石、料)场、弃渣(土、石)场选址和设计深度不满足要求的,应要求予以完善和修正。
Analyzing, evaluating and amending the deficiencies of the main engineering design is an important part of the preparation, examination and approval of soil and water conservation programs in the future. After the analysis and evaluation of the route selection and selection of the main site for construction site selection, the conclusion of construction plans of “consent”, “basic agreement”, “re-argumentation and selection” should be given in different situations; , Earthwork excavation and slag dredging, etc. that do not meet the requirements of soil and water conservation shall be corrected upon request. Where the site selection and design depth of earth (stone, material) and waste slag (soil and stone) sites do not meet the requirements, On request to be improved and amended.