国家“六五”计划批准建设的杭州管道煤气一期工程,最近通过市建委的交工初验.其中设计日产30万标m~3煤气的气源厂已经形成10万m~3/日的生产能力;输配工程已建成40多km中、低压管网和4座调压站,已安装户内管1.6万户,挂表1.14万户.制气和输配的生产管理机构已经建立,主要原、辅材料和各项生产准备工作基本就绪,具备了点火烘炉的条件.
The first phase of the Hangzhou Pipeline Gas Project approved by the National “6th Five-Year Plan” has recently passed the preliminary inspection by the Municipal Construction Committee. Among them, the air source plant with a daily production capacity of 300,000 standard m3 gas has already formed a production of 100,000 m3/day. Capacity; transmission and distribution project has built more than 40 km of medium and low pressure pipe network and 4 pressure regulating stations, has installed 16,000 indoor households, and 114,000 households have been watch-mounted. Production and management agencies for gas production and transmission and distribution have been established, mainly The original and auxiliary materials and various production preparations are basically ready and have the conditions for ignition and baking.