加强施工前的准备内业技术准备。认真阅读施工规范,审核施工图纸,编写审核报告;编写各种针对性的保证措施;结合工程特点,编写技术管理办法和实施细则;备齐必要的参考资料,依据合同条款,技术规范的规定要求,完成各种临时设施符合性数据的采集,进行业务、技术培训和技术交底,使相关人员对工程的技术标准、操作规程、质量控制、资料整理有全面的了解。外业技术准备。进行现场详细调查,根据需要进行地质补充勘探,要补充调查工
Strengthen the preparation before the construction of technical preparations. Carefully read the construction specifications, review the construction drawings, write the audit report; prepare various targeted assurance measures; and compile the technical management measures and implementation details according to the engineering features; prepare the necessary reference materials, according to the provisions of the contract and the technical specifications , Complete the collection of conformity data of various temporary facilities, carry out business, technical training and technical explanation so that relevant personnel have a comprehensive understanding of the technical standards, operation rules, quality control and data arrangement of the project. Technical field preparation. Conduct a detailed investigation on the site, conduct geological supplementary exploration as required, and supplement investigators