1 概况引松人肇工程是为解决肇东市工农业和城镇居民用水紧张而兴建的供水工程.1997年被列为省重点工程.该工程由涝洲抽水站取松花江水经18km涝洲输水干渠,再经托公二级抽水站将水提到托公干渠,经20.3km输水渠道,进入库水闸入反调节水库,再由出库泵站将库水压入6km的压力管线,进市区内的净水厂,最后进入城市管网.反调节水库规模为中型,Ⅲ等工程,库容为1300万m~3.水库由粘性土均质坝,进库水闸、泄水闸和出库泵站组成.坝轴线为园型,直径为2128m,最大坝高8.2m.水库距哈大高速公路500m,距肇东市区6km,水库的安全影响重大,土坝需设计有足够的坝顶超高.本文从风浪的基本因素、风浪要素的计算、波浪爬高的计算等方面阐述引松入肇工程土坝的坝顶超高设计计算.
1 Introduction Yin Song Zhaogong project is to solve Zhaodong industry, agriculture and urban residents water shortage and construction of the water supply project was listed as a provincial key project in 1997. The project from the waterlogged Island pumping station take the Songhua River water 18km Water trunk, and then by the public two pumping station water to the care of the trunk canal, 20.3km water channels, into the sluice into the anti-regulation reservoir, and then by the reservoir pumping station into the 6km pressure pipeline , Into the urban area of the water purification plant, and finally into the city pipe network.The scale of anti-regulation reservoir for the medium, Ⅲ and other projects, storage capacity of 13000000 m ~ 3.The reservoir from clay homogeneous dam, into the reservoir sluice, sluice and Out of the pump station composition.The axis of the dam is of garden type, the diameter is 2128m, the maximum dam height is 8.2m.The reservoir is 500m away from the Harbin-Dalian Expressway, 6km away from Zhaodong city, the safety of the reservoir is significant, and the dam needs to be designed The crest of the dam is extremely high.This article elaborates the design and calculation of the crest height of the earth dam that leads to the Songzao project from the aspects of the basic factors of wind and waves, the calculation of wind and wave elements and the calculation of the wave climbing height.