论文部分内容阅读
广东某油库新建罐区建成后,在灌水试验过程中。发生严重滑坡事故,通过现场情况调查,进行事故原因分析.并采用水泥搅拌桩进行基础加固。
After the completion of a new tank farm in Guangdong, during the irrigation test. In case of a serious landslide, the cause of the accident was analyzed through on-site investigation, and the foundation was reinforced with cement mixing piles.