Research and application of schemes for constructing concrete pillars in large section finishing cut

来源 :International Journal of Mining Science and Technology | 被引量 : 0次 | 上传用户:fdsa5218
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Based on the technology of controlling surrounding rock deformation by constructing concrete pillars in large section finishing cut in backfill coal mining, the characteristics of vertical stress on concrete pillars and main factors influencing pillar stability are analyzed. By building a Winkler elastic foundation mechanical model for the support system constituted of coal pillar, backfill body and concrete pillars,mechanical calculation on stability of concrete pillar is carried out to evaluate the pillar stability and safety. Seven numeral models in three schemes with different pillar sizes, inter-row distances and compression ratios at the stopes were analyzed through numerical simulation according to width reduction principle. The practice of finishing cut at III644 workface at Yangzhuang coal mine shows that: when the actual compression ratio is 86.5%, construction size inside the finishing cut is 2000 mm 2000 mm and the interval between concrete pillars is 2000 mm 2000 mm, the pillars can be stable with the maximum movement of two sides of each pillar being only 83 mm and 54 mm, which achieves the expected effect. Based on the technology of controlling surrounding rock deformation by constructing concrete pillars in large section finishing cut in backfill coal mining, the characteristics of vertical stress on concrete pillars and main factors influencing pillar stability are analyzed. By building a Winkler elastic foundation mechanical model for the support system constituted of coal pillar, backfill body and concrete pillars, mechanical calculation on stability of concrete pillar is carried out to evaluate the pillar stability and safety. Seven numeral models in three schemes with different pillar sizes, inter-row distance and compression ratios at the stopes were analyzed through numerical simulation according to width reduction principle. The practice of finishing cut at III644 workface at Yangzhuang coal mine that that when the actual compression ratio was 86.5%, construction size inside the finishing cut is 2000 mm 2000mm and the interval between concrete pillars is 2000 mm 2000 mm, the p illars can be stable with the maximum movement of two sides of each pillar are only 83 mm and 54 mm, which achieves the expected effect.
其他文献
由云南省国资委牵头,省发改委、住建厅参与,中国建筑金属结构协会、云南昆钢集团、云建集团、中国五洲工程设计研究院共同承担的云南省钢结构产业发展研究课题,11月13日在昆
钝头避雷针、头部带圆环或悬臂的避雷针具有保护范围大,保护效果好的突出优点,同时由于构造简单,工艺简便又使其价格非常低廉.
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
心理学研究有个“二八定律”:人生碰到的事情,只有5%的事情是非常紧要的,非认真对待不可。但非常紧迫、非得认真的事情,在你的一生中不会超过5%。  另外,15%和25%的事情,是需要比较认真对待的,但不是非常紧迫的。就像平时的财务做账,相对来说比较重要,所以可以从容一些,因为还有时间可以调整、修改。  两者合在一起,需要非常紧迫、非常认真地做的事也就占20~30%。重任在肩的管理者,或责任重大一点的
期刊
为加快塑料门窗行业系统门窗的研究开发和高性能塑料门窗推广应用,推动行业技术进步和产品升级,转变行业经营发展模式,同时也使企业间相互交流学习各自的发展经营理念和模式,
目的 通过临床技术改进,减少前路手术出血多、创伤大等问题.方法 采用第10~12肋胸膜外腹膜后径路并改进手术操作程序.结果 临床上对58例胸腰椎骨折并截瘫患者进行的前路手术均
伴随着我国社会经济的快速发展和进步,我国科技领域取得一定成果和进展,其中无线通信技术得以发展和创新.本文以无线通信的内容和技术和现阶段的发展特点为研究出发点,以4G技
Measurement while drilling systems are becoming an important part of excavation operations for rock characterization and ground support design that require reli
期刊
期刊
最易复发:rn肝癌乳腺癌胃癌排前三rn春天,人体内的阳气也顺应自然,有向上向外升发的特点,此时人体的循环系统功能加强,代谢旺盛,生长迅速.癌症患者体内的肿瘤细胞生长、增殖
期刊