基于目前水库除险加固工程进行洪水计算过程中存在的问题,文章以实际工程为例,结合工程所处的水文地质情况,分析了威宁县冒水水库除险加固工程的供水计算方法。其目的是为相关建设者提供一些理论依据。结果表明,要想提高水库除险加固工程洪水计算的科学合理性,需对工程供水计算的原设计内容以及地区出现的历史供水情况进行判断设计。
Based on the actual project, taking the hydrogeology situation in the project as an example, this paper analyzes the water supply calculation method of the reinforcement project of Weining County riser reservoir. Its purpose is to provide some theoretical basis for the relevant builders. The results show that in order to improve the scientific rationality of flood calculation in reservoir reinforcement project, the original design contents of water supply calculation in the project and the historical water supply in the area should be judged and designed.