从整体式提升脚手架倒模施工法技术的方案设计、选定入手,对方案构成及操作运行进行了介绍。通过经济效益、工期分析比较,说明该方案设计合理、结构简单、操作方便,且工期短、效率高,适用于等截面与变截面、直壁与斜壁、超高度的墩柱混凝土结构施工。在小浪底库区黄河公路大桥施工中,运用效果良好。
From the integral promotion of scaffolding construction technology modeling design, selected start with the program structure and operation of the operation were introduced. Through the comparison of economic benefits and construction period, it shows that the scheme is reasonable in design, simple in structure, easy in operation, short in construction period and high in efficiency. It is suitable for the construction of concrete structures with constant cross-section and variable cross-section, straight wall and inclined wall, In Xiaolangdi Reservoir Area Yellow River Highway Bridge construction, the effect is good.