论文部分内容阅读
本文通过叠偏剖面三维偏移归位方法所成构造图,较好的反映了地下构造点的真实位置和深度,克服了以往构造图上的构造点不是地下构造点的真实位置的缺点,为提高开发布井的成功率提供了保证。
In this paper, the tectonic map constructed by the 3D migration-homing method of the overlying partial cross-section shows the true position and depth of the subsurface structural points well and overcomes the shortcomings that the tectonic points on the tectonic map are not the true positions of subsurface structural points. Improve the success rate of the deployment of wells to provide a guarantee.