一、一九六九年春,全国军民正在热烈欢呼我党九大胜利召开的时刻,梅县地区电力基建部门积极响应伟大领袖毛主席:“要迅速改变北煤南运”的号召,以七个月的时间于六九年九月建成了梅西电厂第一期工程,及时向煤矿提供电力。 该厂房高度25米,墙身均采用#50水泥沙浆砌块石(非规格石)结构,墙外勾缝,前后墙厚度下层36厘米,上层28厘米,山墙厚度下层43厘米,上层28厘米。每6米有一条钢筋混凝土护墙柱,每4.5米高有一条防风梁(山墙)和托墙梁(前后墙)。
First, in the spring of 1969, the military and civilian authorities across the country are now warmly celebrating the moment when the victory of the nine major parties in our party is held. The power infrastructure sector in Meixian District responded positively to the call of Chairman Mao, the great leader, "to rapidly change the northbound transport of northern coal to seven months Of the time in September 1960 built the first phase of the Massey Power Plant, the timely provision of electricity to coal mines. The plant height of 25 meters, the walls are made of # 50 cement mortar block stone (non-standard stone) structure, the wall outside the seam, the thickness of the front and rear walls 36 cm lower, upper 28 cm, gable lower 43 cm, the upper 28 cm. There is a reinforced concrete retaining wall column every 6 meters, one windbreak (gable) and wall beam (front and back walls) every 4.5 meters.