In 2002, the accelerating tube has been up-graded for HI-13 tandem accelerator The terminal voltageof the machine has reached 15 MV and some physics experiments were carried out at terminal voltage of14 MV The accumulated beam time was 1 533 h in 2002.1 Accelerating tube up-grading on HI-13 tandem accelerator The accelerating tube up-grading was started on March 18th and finished on September 28th 2002.
In 2002, the accelerating tube has been up-graded for HI-13 tandem accelerator The terminal voltage of the machine has reached 15 MV and some physics experiments were carried out at terminal voltage of 14 MV The accumulated beam time was 1 533 h in 2002.1 Accelerating tube up-grading on HI-13 tandem accelerator The accelerating tube up-grading was started on March 18th and finished on September 28th 2002.