论文部分内容阅读
泉河李坟节制闸电气除险加固工程是在满足当前社会需要的前提下对20世纪70年代竣工的泉河李坟节制闸电气设备进行更新换代,因当前电气设备均为20世纪70年代产品,功能不完善,诸多设备皆已超期服役,亟待对原有设备更新,并进行现代化改装,为保障电气设备安全运行,依据相关规范规程,需增设一套完整的集监控、监测、视频一体化的自动化调度与运行管理系统。
Quan River Li Fen throttle control electrical reinforcement project is to meet the needs of the community under the premise of the 20th century, the completion of the 20th century Quanhe Li Fen Festival gate electrical equipment to be replaced, because the current electrical equipment are 70 years of the 20th century products , The function is imperfect, a lot of equipment have been extended service, the need to update the original equipment, and the modernization, in order to protect the safe operation of electrical equipment, in accordance with relevant norms and regulations, the need to set up a complete set of monitoring, monitoring, video integration Automated scheduling and operation management system.