论文部分内容阅读
北京:1969年10月北京地铁第一期工程投入试运营,现有地铁一线、环线和复八线,总长54公里,已全部贯通运营。规划未来地铁网络总长将达到408公里。天津:1984年12月通车,全长7.4公里,2001年10月9日全线停运,为即将动工的地铁一号线做准备.地铁一号线全长26.195公里,总投资约69亿元,预计2005年底完成。上海:地铁一号线1995年4月全线通车,目前已有3条地铁线投入营运,现有
Beijing: In October 1969, the first phase of the Beijing Subway was put into trial operation. The existing Metro Line, Loop Line and Futian Line have a total length of 54 km and have been fully operational. Planning the future total length of the subway network will reach 408 km. Tianjin: Opened in December 1984, with a total length of 7.4 km and outage on the whole line on October 9, 2001, preparing for the upcoming construction of Subway Line 1. The total length of Metro Line 1 is 26.195 km with a total investment of 6.9 billion yuan, Expected to be completed by the end of 2005. Shanghai: Metro Line opened to traffic in April 1995 and there are currently three subway lines in operation. The existing