论文部分内容阅读
文章介绍了洪家渡水电站表孔弧形工作闸门的安装过程,根据闸墩和设备布置情形,对运输、吊装和安装操作过程控制进行了阐述。
This paper introduces the installation process of the arc-shaped work gate in the face of Hongjiadu Hydropower Station. Based on the pier and equipment layout, the process control of transportation, lifting and installation is described.