【摘 要】
:
详细介绍了水电项目标杆电价的颁布背景,并对抽水蓄能电站的投资收益和投资回收期进行了测算,分析了标杆电价新体制下抽水蓄能电站工程造价、建设工期、风险收益率等因素变化
论文部分内容阅读
详细介绍了水电项目标杆电价的颁布背景,并对抽水蓄能电站的投资收益和投资回收期进行了测算,分析了标杆电价新体制下抽水蓄能电站工程造价、建设工期、风险收益率等因素变化对水电项目投资收益的影响,最后针对各影响因素提出加强投资控制、进度控制管理,确保项目投资收益的建议。
The promulgation background of the benchmark electricity price of hydropower project is introduced in detail. The investment return and investment payback period of the pumped storage power station are also calculated. The factors such as project cost, construction period and risk return rate of the pumped storage power plant under the new benchmark electricity price system are analyzed The impact of changes on the investment income of hydropower projects, and finally put forward suggestions on how to strengthen the investment control, schedule control and management to ensure the investment return of the project according to the various influencing factors.
其他文献
在2009年上海决策咨询工作会议上,上海市委副书记、市长韩正指出,在上海经济发展转型的关键时期,全市决策咨询研究机构和广大专家学者要围绕大局、突出重点,进一步提高工作
构建管道数字图书馆,集合行业专业信息资源的优势,为行业服务,为企业服务,为从业人员服务。
Construction of pipeline digital library, gathering the advantages of indu
五心’丁住川月八J‘刁沃个了子阮‘UU夕于扮1们刚气J于哪场) 睿 勺 系别 专业名称 计划 招生对象及人数 学费 标准 备注 1 财 税 系 320 企业税务会计 80 高中(30)三校(50)
随着我国人民生产生活对煤炭产品质量的要求越来越高,煤炭洗选加工环节受到了更多的关注。该环节是洁净煤工艺中较为重要的环节,在我国能源结构中占据重要地位。本文先对煤炭
当前,航运企业面临着来自国内外市场竞争的挑战和考验,要在强手如林的市场竞争中占据一席之地,企业内部必须具备健全的抗衡机制。为此,必须加强财务管理,开展事前预测,发挥财务管理
四川省南充专区文教局于11月上旬,召开了灯戏艺人座談会。出席的有灯戏的老艺人及新培养的青年演員伍俊山、肖德波等十多人。会議上討論了关于灯戏的發展方向、剧目工作和培
解决战斗型架桥机在小半径曲线架梁时有关零号柱落位、梁片通过一号车一号柱、二号柱和落梁端重叠问题。
To solve the battle erecting machine in the small radius curve
组织部门如何在指导和服务村级先进性教育活动的同时,抓好自身教育活动的开展?成都市委组织部结合工作实际,有效解决了这一问题。着力提高组工干部素质和能力。采取集中学习
要建立落叶松固定采种区,必须大量选择高产优树,但目前许多选优方法往往要等林分达到50—60龄或更大的年龄时才能适用,而且没有考虑到树木种子的产量和质量。
A large numb
某工程岩体具有开挖后加速风化的特点,由于雨水下渗易形成软弱结构面,加上原有软弱结构面的存在,岩体开挖超过稳定极限高度后,首先沿岩体原有软弱结构面破坏,然后沿边坡开挖