论文部分内容阅读
举例说明分项工程、分部工程和单位工程质量评定用表的使用方法和评定程序(一)分项工程评定举例分项工程的评定一般是用预先印制好的评定表来进行、将某分项工程的保证项目、基本项目和允许偏差项目的质量指标逐一列入分项工程的样表中。基本项目由于分合格、优良的质量指标,条文较多,表中只列项目标题,合格、优良的指标附于表背面。并将保证项目、允许偏差的检查数量、检验方法也附在表背面。分项工程评定用表的填写方法:1.表头工程名称和部位。工程名称填写单位工程名称。在单位工程较多的建筑群中,还应冠以所
Examples of the use of methods and assessment procedures for sub-items, sub-projects, and unit-work quality-assessment tables (I) Examples of sub-item engineering assessment The assessment of sub-item projects is generally performed using a pre-printed assessment form. The quality indicators of the sub-project guarantee items, basic items and permissible deviation items are listed one by one in the sub-project sample form. Due to the qualified and excellent quality indicators for basic items, there are many articles. Only the item titles are listed in the table. Qualified and excellent indicators are attached to the back of the table. And the number of inspections, inspections, and inspection methods of guaranteed items, allowable deviations are also attached to the back of the table. Sub-item project assessment form filling method: 1. Header project name and location. Project Name Enter the name of the project. In buildings with more unit works, they should also be awarded