论文部分内容阅读
1.1.1 反应堆的运行时间和积分功率反应堆的主运行功率8MW,安全运行2391.87h,释放能量为799.39MW·d(表1)。1992年研究性重水反应堆运行情况
1.1.1 Reactor Operating Hours and Integral The main operating power of the reactor is 8MW, safe operation is 2391.87h, and the released energy is 799.39MW · d (Table 1). 1992 Research heavy water reactor operation