论文部分内容阅读
聊城星光城市广场.会展办公公寓为32层钢筋混凝土剪力墙结构,楼高99.99m。在3~28层,为两个独立的结构单元;在1层、2层和28层以上为一个结构单元,视觉上形成凯旋门的形式。28~32层的连体部分为型钢混凝土结构,该部分施工平台搭设、模板支设及拆除是工程的难点。经过分析,满堂脚手架和将操作平台、支撑体系吊在钢结构框架,这两种模板支撑体系,结果表明,后者可大大降低施工成本,且安全可靠。
Liaocheng Star City Plaza. MICE apartment for the 32-story reinforced concrete shear wall structure, 99.99 m tall. On the 3rd to 28th floors, there are two independent structural units. On the 1st, 2nd and 28th floors, one structural unit is visually formed as an Arc de Triomphe. Piece 28 ~ 32 Siamese part of the steel-concrete structure, the part of the construction platform erection, template support and demolition of the project is the difficulty. After analysis, full of scaffolding and the platform, support system hanging in the steel frame, the two template support system, the results show that the latter can greatly reduce the construction cost, and safe and reliable.