论文部分内容阅读
华能北京热电厂的 TП- 1 40 /1 65- 1 30 /1 5-2型俄供抽汽供热式机组是国内首次引进 ,除本体结构设计外 ,其电液调节系统的原理、结构和设计也很独特。通过调试 ,对该系统积累了一些经验 ,也发现其存在一定问题 ,为此加以总结和分析 ,提供给国内同类机组作为借鉴
The TП-1 40/1 65-130 / 1 5-2 Russian-supplied extraction and heating unit of Huaneng Beijing Thermal Power Plant is the first time introduced in China. The principle, structure and design of the electro-hydraulic adjustment system except for the structure design of the main body It is also unique. Through debugging, this system has accumulated some experience, but also found that there are some problems, to be summed up and analyzed, to provide similar units as a reference