论文部分内容阅读
石头河水库是七、八十年代以农田灌溉为主要目的兴建起来的大Ⅱ型水库.近几年来,他们围绕优势做文章,以水兴“电”、以电兴“工”,逐步走出了一条“综合开发,滚动发展”的产业化路子,经营范围由单纯的农田灌溉发展到供水、水电、工业生产、旅游服务、水电施工等多领域,固定资产由过去的2亿多元增加到现在的4.9亿元.这条以水兴“电”、以电兴“工”的路子是如何走出来的呢?一是解放了思想,转变了观念,抓住了发展机遇改革开放以来,围绕如何发挥水库优势、壮大全局经济实力,他们组织开展了三次大的思想讨论,推动经济发展实现了三次大的跨越:第一次是八十年代末水库工程基本建成以后,针对建设拨款减少,全局入不敷出的实际,管理局组织
In recent years, they made a fuss about the advantages, took “watering up electricity” and “electrifying” workers and gradually stepped out from the “large-scale reservoirs” built in the 1970s and 1980s. A “comprehensive development and rolling development” industrialization path, the scope of business from a simple farmland irrigation development to water supply, water and electricity, industrial production, tourism services, construction of hydropower and other fields, fixed assets from the past more than 200 million yuan increased to the present Of the 490 million yuan .This to water to “electricity” to electricity to “work” way out? First, the liberation of ideas, changing the concept, seize the opportunity for development since the reform and opening up, how Three major leaps and bounds in their economic development have been organized by giving full play to the advantages of reservoirs and strengthening the overall economic strength. The first time was that after the reservoir engineering was basically completed in the late 1980s, funding for construction was reduced and the overall situation was overdrawn The actual, Authority organization