论文部分内容阅读
在总结多座顶推梁预应力张拉和压浆的基础上,对有关问题的分析与处理进行了详细介绍。同时介绍了一种新型钢绞线联接器。
On the basis of summarizing the prestressed tensioning and grouting of several jacking beams, the detailed analysis and treatment of the related problems are introduced in detail. At the same time introduced a new strand coupler.