上海石化热电总厂热电二站主要承担着为股份公司安全供电、供热的任务。目前装有5台汽轮发电机组,4台燃煤锅炉,总装机容量为22.5万千瓦时,锅炉总蒸发量为1640T/H,1999年我站共发电13.7亿千瓦时,供热894.8万百万千焦,分别占热电总厂总发电、供热的58.5%和67.6%。我站目前在册职工420人,35岁以下青年人所占比例为85%,是一支年轻而精干的队伍。我站员工紧扣市场经济脉
Shanghai Petrochemical Thermal Power Plant thermoelectric plant two main commitment to the security company for power supply, heating tasks. Currently equipped with five turbo-generator sets, four coal-fired boilers, with a total installed capacity of 225,000 kwh, the total boiler evaporation of 1640T / H, in 1999 I station a total of 1.37 billion kwh electricity generation, heating 8,948,800 Ten thousand kilocalories, accounting for 58.5% and 67.6% of the total power generation and heating of the thermal power plant respectively. My station is currently registered 420 workers, young people under the age of 35 accounted for 85%, is a young and capable team. I station staff closely linked to the pulse of the market economy