请下载后查看,本文暂不支持在线获取查看简介。一段的保护处有无破坏情况;对于暗装的防雷网或利用混凝土柱子钢筋作为引下线的设施,应每隔5-6年由顶部明装防雷线的地方检查测量1次接地电阻;接地卡子有无接触不良情况;测量全部接地装置的接地电阻,如发现接地电阻值有很大变化时,应对接地系统进行全面检查,必要?
Please download to view, this article does not support online access to view profile. For a concealed lightning protection network or the use of concrete columns as a down lead wire reinforcement facilities should be every 5 to 6 years from the top of the installation of lightning protection line place inspection and measurement of a grounding resistance ; Grounding clamp whether the bad contact; measuring all grounding device grounding resistance, grounding resistance value found if there is a great change, the grounding system should be fully checked, it is necessary?