浅议固定总价承包合同报价注意事项

来源 :施工企业管理 | 被引量 : 0次 | 上传用户:wr123456789dtdx
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
固定总价承包合同是以施工图纸和工程招投标说明书为依据,明确承包内容后进行报价,确定总价后一次包死的建筑工程承包合同形式。固定总价又称闭口价,其特点是合同一旦签订,总价就确定下来了,任何合同总价的错误,无论是计算上的错误,还是其它错误,皆视为已获双方认可。这个价格包括合同图纸全部内容和所 The fixed total price contract is based on the construction drawings and the project bidding instructions, after clarifying the contents of the contract, the price is quoted, and once the total price is determined, the construction contract contract form that is once packaged and died is determined. Fixed price, also known as closed price, is characterized by the fact that once the contract is signed, the total price is determined. Any mistake in the total price of the contract, whether it is a calculation error or other error, is considered to have been recognized by both parties. This price includes the entire contents of the contract drawings and
其他文献
一、“一切为了每一位学生的发展”是新课程的最高宗旨和核心理念。作为发展的人,也就意味着学生是一个不成熟的人,是一个正在成长的人。从教育角度讲,它意味着学生是在教育
90年代初以来,知识经济与经济全球化趋势深刻地影响着各国的经济发展。美国连续八年的经济增长表明,以技术创新为主要内容和动力的发展模式极富生命力。相反,一向以重视技术
本文认为, 当前, 我国国有企业生产率低、经济效益差的问题依然十分突出, 其原因错综复杂,但管理滞后、创新不足是极为重要的原因。作者提出了国有企业管理创新的方向: (1)
来自美国纽约的菲利普莫里斯公司集团是世界最大的生产和销售带外包装消费品的公司,核心业务包括食品、啤酒和烟草。在全球90多个国家和地区拥有426个生产厂,共有员工超过15
关于金华火腿的起源,历来众说纷纭。相传在很早以前,东南沿海一带,海水泛滥成灾,庄稼、牲畜、民房多被洪水淹没。退潮之后,有人从海滩上挖出淹死的猪只,剖见肉色红润,食之其
河北省环境科学研究院和中国科学院化工冶金研究所合作开发的秸秆综合利用新技术——利用玉米秸秆等研制热解油和有机钙盐脱硫脱硝剂,于日前通过了由国家环保总局、科技部、
目前,世界水泥并非只有我们见到的建筑业所用的一种灰黑色的普通硅酸盐水泥和白色水泥,品种可谓五花八门,性能各异: 荧光水泥:日本研制出一种荧光水泥。这是在水泥中加 At
新世纪以来,市场经济体制日臻完善,知识经济方兴未艾,政治经济体制都在发生着深刻地变革,教育也不例外。面对高度信息化、知识密集型、竞争日趋激烈、人才需求越来越高、家庭
概述了航天火工装置无损检验对保证航天型号用火工装置的质量与可靠性、避免灾难性事故、提高发射成功率起的重要作用 ,分析了航天火工装置的中子照相、X射线和γ射线工业CT
近日,国务院印发了《国务院关于深化农村义务教育经费保障机制改革的通知》,召开了全国农村义务教育经费保障机制改革工作会议,对建立农村义务教育经费保障新机制进行了全面