蒲圻水利枢纽的电站厂房位子大坝左岸。厂房型式为坝后式(见图甲——甲及4——4剖面),全长68.8米。其中主厂房长46.8米,装配场和试验机组长22米。厂房内共安装每台容量为8,800瓩的卡泊兰式水输发电机4台,试验机组1台。厂房由主厂房、副厂房、装配场、试验机组、配电站等部分组成。配电站位于下游左岸150米左右处,主厂房一般高度为33.15米,厂房岩石最低高程为9.0米,厂房顶高程为52.35米,底板高程为19.985米,水轮机装机高程为28.0米,水轮机层高程为30.2米,发电机楼板高程为36.3米,试验机组装配场均位于主厂房左岸。
Power station in Pu-li water conservancy hydropower station seat on the left bank. The plant type for the dam type (see Figure A - A and 4 - 4 section), a total length of 68.8 meters. One of the main plant 46.8 meters long, assembly and testing unit leader 22 meters. The factory houses a total of 4 units of Camberlan generator units with a capacity of 8,800 瓩 and one test unit. Plant from the main plant, deputy plant, assembly plant, test units, distribution stations and other components. The distribution station is located on the left bank of the downstream about 150 meters, the main plant height of 33.15 meters, plant rock elevation of 9.0 meters, the plant elevation of 52.35 meters, the floor elevation of 19.985 meters, the turbine installed elevation of 28.0 meters, turbine level elevation 30.2 meters, generator floor elevation of 36.3 meters, the test unit assembly are located on the left bank of the main plant.