论文部分内容阅读
以钦州、防城港电网2007年丰水期大方式为基础研究对象,对钦州、防城港电网进行故障潮流稳定计算分析,根据计算分析的结果,确定了安全稳定控制装置的总体配置方案,得出了在带次负荷的110 kV佛子坳变电站装设切负荷安稳装置是必要的和可行的。
Taking Qinzhou and Fangchenggang power grids as major research objects in 2007, this paper analyzed and analyzed the stability of fault flow in Qinzhou and Fangchenggang power grids. Based on the results of calculation and analysis, the overall configuration of safety and stability control devices was determined. It is necessary and feasible to install the load-shedding stability device in the 110 kV Fozi Au substation with sub-load.