论文部分内容阅读
结合二滩水电开发有限责任公司(以下简称“二滩公司”)雅砻江流域水能资源的开发“四阶段”战略部署,为优化设备检修,充分发挥各电站调节作用,使综合效益最大化,制定出一套适用于流域梯级电站的检修策略,用于指导设备的检修工作,同时合理利用检修资源,最大限度地降低检修成本,保证生产设备可靠运行。基于对国内新老电厂及二滩水力发电厂(以下简称“二滩水电厂”)设备生产厂家广泛调研的基础上,对检修策略进行了深入研究,并结合实际制定出了一套科学的检修策略,希望为国内同类水电厂提供借鉴。
In combination with the strategic plan of “four phases” for the development of hydropower resources in the Yalong River Basin, Ertan Hydropower Development Co., Ltd. (hereinafter referred to as Ertan Hydropower Development Co., Ltd.), in order to optimize equipment maintenance and give full play to the regulatory role of various power plants, To maximize the overall benefits, a set of maintenance strategies applicable to cascade hydropower stations in the basin are formulated to guide the overhaul of equipment, and at the same time make rational use of maintenance resources to minimize maintenance costs and ensure the reliable operation of production equipment. Based on extensive research on equipment manufacturers of new and old power plants in China and Ertan Hydropower Plant (hereinafter referred to as “Ertan Hydropower Plant”), the maintenance strategy was studied in depth and a set of scientific Maintenance strategy, hope for the domestic similar hydropower plant to provide reference.