【摘 要】
:
To define a tectonic environment switching from rifting to subduction and their respective duration time are usually largely debated.Such case occurs for the Li
【机 构】
:
State Key Laboratory of Lithospheric Evolution, Institute of Geology and Geophysics, Chinese Academy
【出 处】
:
Acta Geologica Sinica(English Edition)
论文部分内容阅读
To define a tectonic environment switching from rifting to subduction and their respective duration time are usually largely debated.Such case occurs for the Liaohe rift:whether it went through a long subduction from 2100to 1850 Ma or there were two different events in different
To define a tectonic environment switching from rifting to subduction and their alternate duration time are usually done debated.Such case occurs for the Liaohe rift whether it went through a long subduction from 2100to 1850 Ma or there were two different events in different
其他文献
随着人们生活质量的提升人们对城市的功能性要求越来越多,市政工程是保证人们生活和工作的基础型工程,其中包括给排水工程、通信工程、道路工程等.为了发挥市政工程的最大建
在我国进入21世纪快速发展的新时期,城市建设在不断加快,近些年随着城市建设的飞速发展,市政工程施工规模、数量不断增加,这对市政工程施工现场的安全管理提出了更新更高的要
在当今社会背景下,我国的建造业发展也在不断地向前向好,然而建设施工势必要消耗大量的能源与资源,在能源紧张的当下,对建筑施工管理进行创新以及探索绿色施工成为了现代化建
随着我国城市化进程的加快,建筑工程的数量及规模随之增多和增大,因此对于建筑工程质量控制越来越受到关注,而建筑工程的进度控制是建筑工程能够顺利完工的基础.分析了建筑工
In Espírito Santo State,Brazil,between the municipalities of Vitória,Colatina and Ecoporanga,there is a mountainous region characterized by a shear zone which
随着我国用电量的不断增加,电力土建工程在具体施工的过程中,必须采取更加科学合规的管理方式,持续提升整个土建工程的质量.目前,我国电力土建工程在相关作业流程中存在不少
随着我国公路铁路的的飞速发展,隧道工程出现的频率也越来越高,本文通过研究太阳山至彭阳段,中铁建大桥工程局集团西北工程公司承建的银昆高速南梁隧道的湿陷性黄土隧道软弱
在我国经济高速发展的今天,各种建筑工程越来越多,对建筑工程施工要求不断提升.商业建筑的规模相对大,建设难度也较大,对各部门工作开展,有着非常严格的要求.为了保证商业建
工程项目管理是以质量管理为核心组织、计划、实施的具体活动,市政道路工程具有覆盖范围广、起止里程长、专业分项多、施工要求高等特征,如何提高工程质量管理水平成为当前亟
随着经济的高速发展,城市化进程的加快,使城市土地资源越来越紧缺,同时也促使了建筑业的快速发展.在建筑工程发展的过程中,管理是不可或缺的,尤其是建筑安全管理,一方面是由