论文部分内容阅读
<正>1. HIRFL Operation HIRFL accelerator complex was fully in operation in 2004. The main cyclotron SSC has been operated since July, 2004 after some time shut-down for upgrading the SSC power supply system, control and diagnostic system, and the mai