论文部分内容阅读
江苏省连云港市东临黄海,海岸线较长,沿海挡潮闸、排涝站等水工建筑物众多,这些建筑物长期受海洋盐雾侵害,工程损坏严重,使用寿命缩短,多年来对这些建筑物不断进行维修加同处理,以延长其使用寿命。大浦抽水站地处临海,受海洋盐雾侵害非常严重,延长工程的使用寿命,成了大浦站工程施工时考虑的首要问题。为延长大浦抽水站工程使用寿命,使用高性能混凝土使其不仅能满足强度要求而且能够
Lianyungang City, Jiangsu Province, east of the Yellow Sea, the coastline is longer, coastal tidal flats, drainage stations and other hydraulic structures are numerous, these buildings have long been affected by salt spray of the sea, serious damage to the project, shortened service life, these buildings Continued maintenance plus processing, to extend its service life. Dapu pumping station is located in the sea and is seriously damaged by salt spray of the sea. The extension of the service life of the project has become the primary problem to be considered in the construction of Taipu Station. In order to prolong the service life of Dapu pumping station, the use of high-performance concrete not only meets the strength requirements but also enables