论文部分内容阅读
建国三十三年来,我国已建和在建的大型水利水电工程已达300余座,总装机容量达3000余万千瓦(已建的2100余万千瓦,在建的1058万千瓦),其中坝高80米以上的水电站34座,洞长2000米以上的水电站28座,装机30万千瓦以上的水电站24座,装机10万千瓦以上的57座.在建设这些水利水电工程的过程中,地质勘测工作也得到相应的发展.下面从三个方面简述我国水利水电工程地质勘测工作的发展概况.
In the 33 years since the founding of the People’s Republic of China, China has built and under construction more than 300 large-scale water conservancy and hydropower projects with a total installed capacity of over 30 million kilowatts (21 million kilowatts built and 10.58 million kilowatts under construction) 34 hydropower stations with an altitude of 80 meters, 28 hydropower stations with a length of 2000 meters or more, 24 hydropower stations with an installed capacity of over 300,000 kilowatts, and 57 hydropower stations with an installed capacity of 100,000 kilowatts or more. During the construction of these water conservancy and hydropower projects, The work has also been the corresponding development.From the following three aspects of China’s water conservancy and hydropower engineering geological survey development overview.