论文部分内容阅读
企业简介兴隆庄煤矿系国家“六五”期间重点建设项目,是我国自行设计和建造的第一座设计年产300万吨大型现代化矿井。井田面积54平方公里,地质储量7.8亿吨,1981年12月21日建成投产,主要设备从美国、英国等8个国家引进,采掘机械化程度达100%,现核定生产能力跃升至年产660万吨。与矿井相配套的有年入洗量300万吨的大型现代化选煤厂与亚洲第一家煤泥热电公司。
Brief Introduction of Xinglongzhuang Coal Mine The key construction projects during the period of “65” in Xinglongzhuang Coal Mine are the first large-scale modernized mine with an annual output of 3 million tons designed and constructed by our country. Minefield area of 54 square kilometers, the geological reserves of 780 million tons, completed and put into production on December 21, 1981, the main equipment from the United States, Britain and other eight countries to introduce, mining mechanization degree of 100%, is now approved production capacity jumped to an annual output of 6.6 million Ton. Matched with the mine in the amount of 3 million tons into the large-scale modern coal preparation plant and Asia’s first coal slime thermoelectric company.